BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//https://d10-dev-3.techsoc.org.uk//NONSGML iCalcreator 2.41.56//
CALSCALE:GREGORIAN
METHOD:PUBLISH
UID:31363665-3562-4262-b534-373035666532
X-WR-RELCALID:1ce63243-9350-42c8-9bce-7f4e7f319bf8
X-WR-TIMEZONE:Europe/London
X-WR-CALDESC:Calendar feed for a Talk for an Anonymous User
BEGIN:VTIMEZONE
TZID:Europe/London
TZUNTIL:20281029T010000
BEGIN:STANDARD
TZNAME:GMT
DTSTART:20261025T020000
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
RDATE:20271031T020000
END:STANDARD
BEGIN:DAYLIGHT
TZNAME:BST
DTSTART:20260329T010000
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
RDATE:20270328T010000
RDATE:20280326T010000
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
UID:0139e1c4-f725-4cc7-b9d0-6f89ea7e4436
DTSTAMP:20260419T095524Z
CLASS:PUBLIC
CREATED:20260306T164237Z
DESCRIPTION:Wintertime & the London Underground \n\nTalk synopsis \n\nFor t
 he most part Londoner Underground is not actually underground\, it is bunc
 overed. \n\nHow does LU cope with conditions of ice\, snow\, fog\, leaf-fa
 ll and the other difficulties of operating a surface railway in wintertime
 ? \n\nSpeaker biography \n\nSteve's first role at London Underground was a
 s Control Equipment Engineer in the Rolling Stock department - part of Pro
 fessional Services Group & based at Acton Works. \n\nAs part of the Engine
 ering Refocus he took on the role of Team Co-ordinator for the Central lin
 e team in Trains Delivery Groups based at 30 the South Colonnade\, Canary 
 Wharf before moving on to lead the District and Piccadilly line team.
DTSTART;TZID=Europe/London:20261112T173000
DTEND;TZID=Europe/London:20261112T190000
LAST-MODIFIED:20260307T184832Z
LOCATION:A Transport for London building\, to be advised
SUMMARY:TechSoc Talk: Wintertime & the London Underground - Steve
TRANSP:OPAQUE
X-ALT-DESC;FMTTYPE=TEXT/HTML:<article data-history-node-id='11274' class='n
 ode node--type-talk node--promoted node--view-mode-ical-public clearfix'> 
 <div class='node__container'> <div class='node__main-content clearfix'> <h
 eader class='node__header'> <h2 class='node__title'> <a href='https://d10-
 dev-3.techsoc.org.uk/talks/wintertime-london-underground' rel='bookmark'><
 span class='field field--name-title field--type-string field--label-hidden
 '>Wintertime & the London Underground</span> </a> </h2> </header> <div cla
 ss='clearfix text-formatted field field--name-field-talk-synopsis field--t
 ype-text-with-summary field--label-above'> <div class='field__label'>Talk 
 synopsis</div> <div class='field__item'><p>For the most part Londoner <str
 ong>Underground </strong>is not actually underground\, it is buncovered.</
 p> <p>How does LU cope with conditions of ice\, snow\, fog\, leaf-fall and
  the other difficulties of operating a surface railway in wintertime?</p> 
 </div> </div> <div class='clearfix text-formatted field field--name-field-
 speaker-biography field--type-text-with-summary field--label-above'> <div 
 class='field__label'>Speaker biography</div> <div class='field__item'><p>S
 teve's first role at London Underground was as Control Equipment Engineer 
 in the Rolling Stock department - part of Professional Services Group & ba
 sed at Acton Works.</p> <p>As part of the Engineering Refocus he took on t
 he role of Team Co-ordinator for the Central line team in Trains Delivery 
 Groups based at 30 the South Colonnade\, Canary Wharf before moving on to 
 lead the District and Piccadilly line team.</p> </div> </div> </div> </div
 > </article>
END:VEVENT
END:VCALENDAR
